3. Replat – MECP1 Addition, Lot 1, Block 1: Consider and take necessary action on a request for approval of a replat of a 33.36-acre lot, located at 3051 Research Drive, at the northeast corner of Shiloh Road and Research Drive to accommodate the development of a data center. Applicant: Chet Leugers, Pacheco Koch, representing Edgecore. Staff: Chris Shacklett. 4. Replat – Synergy Park Addition, Lot 4D, 7 & 8, Block A: Consider and take necessary action on a request for approval of a replat of a 13.03-acre lot, located at 1323 W. President George Bush Highway, on the south side of W. President George Bush Highway, north of Waterview Parkway and Frankford Road. The purpose of the replat is to subdivide one (1) lot into three (3) lots to accommodate the development of a limited service hotel. Applicant: Pann S. Sribhen, PSA Engineering, LLC, representing DFW Hospitality of Richardson and Granite 190 Center, Ltd. Staff: Chris Shacklett.
2. Final Plat – Duck Creek Office and Retail Addition, Lots 1 and 2, Block A: Consider and take necessary action on a request for approval of a final plat of a 5.843-acre site to create two (2) lots to accommodate an office development on the southern lot. The 5.843-acre site is located on the east side of Plano Road, south of Arapaho Road. Applicant: Aaron M. Graves, Kimley-Horn & Associates, representing Duck Creek Trail Professional Park, Ltd. Staff: Daniel Harper. 3. Replat – MECP1 Addition, Lot 1, Block 1: Consider and take necessary action on a request for approval of a replat of a 33.36-acre lot, located at 3051 Research Drive, at the northeast corner of Shiloh Road and Research Drive to accommodate the development of a data center. Applicant: Chet Leugers, Pacheco Koch, representing Edgecore. Staff: Chris Shacklett. 4. Replat – Synergy Park Addition, Lot 4D, 7 & 8, Block A: Consider and take necessary action on a request for approval of a replat of a 13.03-acre lot, located at 1323 W. President George Bush Highway, on the south side of W. President George Bush Highway, north of Waterview Parkway and Frankford Road. The purpose of the replat is to subdivide one (1) lot into three (3) lots to accommodate the development of a limited service hotel. Applicant: Pann S. Sribhen, PSA Engineering, LLC, representing DFW Hospitality of Richardson and Granite 190 Center, Ltd. Staff: Chris Shacklett.
Variance 19-01 – Texas Instruments RFAB: A request for a variance from Chapter 21, the Subdivision and Development Code, amending the variance granted in 2011 to increase the number of ground mounted tanks, between 50’ to 110’ in height, for the property located at 300 W. Renner Road, at the northwest corner of Renner Road and Alma Road. Applicant: Eric Kuehmeier, Page Southerland Page, Inc., representing Texas Instruments. Staff: Chris Shacklett.
Zoning File 19-01 – Banyan Hypnosis Center: Consider and take the necessary action on a request for approval of a Special Permit for a hypnosis center located within an existing building located at 275 W. Campbell Road. The property is currently zoned LR-M(2) Local Retail. Applicant: Calvin D. Banyan, Banyan Hypnosis Center for Training & Services, Inc. Staff: Amy Mathews. ADJOURN
3. Replat – MECP1 Addition, Lot 1, Block 1: Consider and take necessary action on a request for approval of a replat of a 33.36-acre lot, located at 3051 Research Drive, at the northeast corner of Shiloh Road and Research Drive to accommodate the development of a data center. Applicant: Chet Leugers, Pacheco Koch, representing Edgecore. Staff: Chris Shacklett. 4. Replat – Synergy Park Addition, Lot 4D, 7 & 8, Block A: Consider and take necessary action on a request for approval of a replat of a 13.03-acre lot, located at 1323 W. President George Bush Highway, on the south side of W. President George Bush Highway, north of Waterview Parkway and Frankford Road. The purpose of the replat is to subdivide one (1) lot into three (3) lots to accommodate the development of a limited service hotel. Applicant: Pann S. Sribhen, PSA Engineering, LLC, representing DFW Hospitality of Richardson and Granite 190 Center, Ltd. Staff: Chris Shacklett.
2. Final Plat – Duck Creek Office and Retail Addition, Lots 1 and 2, Block A: Consider and take necessary action on a request for approval of a final plat of a 5.843-acre site to create two (2) lots to accommodate an office development on the southern lot. The 5.843-acre site is located on the east side of Plano Road, south of Arapaho Road. Applicant: Aaron M. Graves, Kimley-Horn & Associates, representing Duck Creek Trail Professional Park, Ltd. Staff: Daniel Harper. 3. Replat – MECP1 Addition, Lot 1, Block 1: Consider and take necessary action on a request for approval of a replat of a 33.36-acre lot, located at 3051 Research Drive, at the northeast corner of Shiloh Road and Research Drive to accommodate the development of a data center. Applicant: Chet Leugers, Pacheco Koch, representing Edgecore. Staff: Chris Shacklett. 4. Replat – Synergy Park Addition, Lot 4D, 7 & 8, Block A: Consider and take necessary action on a request for approval of a replat of a 13.03-acre lot, located at 1323 W. President George Bush Highway, on the south side of W. President George Bush Highway, north of Waterview Parkway and Frankford Road. The purpose of the replat is to subdivide one (1) lot into three (3) lots to accommodate the development of a limited service hotel. Applicant: Pann S. Sribhen, PSA Engineering, LLC, representing DFW Hospitality of Richardson and Granite 190 Center, Ltd. Staff: Chris Shacklett.
Variance 19-01 – Texas Instruments RFAB: A request for a variance from Chapter 21, the Subdivision and Development Code, amending the variance granted in 2011 to increase the number of ground mounted tanks, between 50’ to 110’ in height, for the property located at 300 W. Renner Road, at the northwest corner of Renner Road and Alma Road. Applicant: Eric Kuehmeier, Page Southerland Page, Inc., representing Texas Instruments. Staff: Chris Shacklett.
Zoning File 19-01 – Banyan Hypnosis Center: Consider and take the necessary action on a request for approval of a Special Permit for a hypnosis center located within an existing building located at 275 W. Campbell Road. The property is currently zoned LR-M(2) Local Retail. Applicant: Calvin D. Banyan, Banyan Hypnosis Center for Training & Services, Inc. Staff: Amy Mathews. ADJOURN